Sheep Creek Water Company Consolidation Plan Proposal

The SCWC Consolidation Committee met with the PPHCSD Engineering Committee on April 29, 2019 to begin discussions of possible consolidation of the two water systems.  The PPHCSD Engineering Committee requested that SCWC submit a proposed plan for consolidation.  The SCWC Consolidation Committee prepared a plan for the SCWC Board to approve.  The SCWC Board of Directors approved the proposed consolidaiton plan to present to the PPHCSD. 

Included with the plan is an Appraisal Report of the Sheep Creek Water System and Assets.  The current assessed value of the SCWC is $23,850,000.  

See the Engineering Tab for the link to the Consolidation Plan and Appraisal Report